Case Study

40% reduction in cooling costs for an injection moulder

In plastic injection, controlling temperatures is crucial for part quality and productivity. A manufacturer reduced its energy costs by 40% thanks to a targeted upgrade of its cooling system, without compromising its production performance.

MTA deployed a bespoke solution combining high-efficiency technologies and intelligent control, demonstrating that industrial performance and energy efficiency can go hand in hand.

Context

The company faced several critical challenges:

  • Ageing equipment leading to high maintenance costs
  • Excessive energy consumption undermining its competitiveness
  • The need for more precise thermal control to guarantee product quality
  • CSR targets requiring a reduced carbon footprint

Solution

MTA designed an optimised system incorporating:

Key technologies:

  • New-generation chillers with screw compressors and electronic speed control
  • Intelligent control adapting to production needs
  • Heat recovery to make use of the thermal energy

Optimisations deployed:

  • Hydraulic network recalculated to minimise pressure losses
  • Precise matching of cooling capacity to actual needs
  • Remote monitoring for proactive performance tracking

Result

The new installation generated remarkable gains:

  • 40% savings on annual energy costs
  • 25% improvement in thermal stability
  • Fewer maintenance interventions
  • Lower environmental impact
  • Scalable system ready for future needs

Need a custom solution?