Case Study

Integrated cooling solution for a Birmingham hospital

Faced with critical challenges around service continuity and patient comfort, a Birmingham hospital called on MTA for a dual mission: protecting its medical data centre and optimising the climate of patient areas. Our solution combined operational security with occupant wellbeing.

Context

The hospital faced two major challenges:

  1. Data centre:
    • Risk of overheating during the works
    • The need to maintain 100% availability
  2. Patient services:
    • Uneven thermal comfort in the rooms
    • Strict health requirements

Solution

MTA deployed an integrated approach:

For the data centre:

  • High-density temporary chillers
  • Full system redundancy
  • 24/7 monitoring of critical parameters

For the patient areas:

  • Quiet thermal-comfort units
  • Independent zone-by-zone control
  • Medical-grade air filtration

Key benefits:
→ 100% availability of the IT systems
→ Noticeable improvement in patient comfort
→ Installation with no disruption to activities
→ Scalable solution to suit requirements

Result

The intervention delivered:

‍

  • Zero interruption to critical services
  • Optimal temperatures across all areas
  • Fewer complaints related to thermal comfort
  • Complete flexibility (adjustable duration)